NZ Oil Services Limited

Airport Switchroom Upgrade

More case studiesBook a job

The problem

New Zealand Oil Services new Gas Detection Systems project at their Lyttelton terminal was complex. It required the installation of 31 vapour and toxic detection units and needed to be completed on time to the highest standard without incidents.

Our solution

Project scope for Stack Electrical included the installation of gas detection system mounting and cabling, and the installation and commissioning of gas detection units.

Being a Major Hazard Facility, we must have the best contractors working on our site and Stack Electrical are the best.

Jamie Cross

Being a Major Hazard Facility we must have the best contractors working on our site and Stack Electrical are the best. They have recently just completed a complex project installing 31 vapour and toxic detection units at our facility which was completed on time to the highest standard and without incidents. I wouldn’t use anyone else but Stack Electrical.
Jamie Cross